Duos Edge AI 2101 W Loop 340
2101 W Loop 340,Waco, Texas GPU ready
"Duos Edge AI 2101 W Loop 340 is a Tier 3 data center facility located in 2101 W Loop 340, Waco. The facility offers 328,000 sq ft of data center space with 55.2 MW of total power capacity. GPU-ready infrastructure supports AI/ML workloads with high-density power configurations.
Facility specifications
| Operator | Duos Edge AI |
|---|---|
| Tier | Tier 3 |
| Total power | 55.2 MW |
| Available power | 17 MW |
| Rack density | 22 kW/rack |
| Cooling | air |
| PUE | 1.50 |
| Total space | 328,000 sq ft |
| Year built | 2019 |
| Renewable energy | 12% |
| AI readiness score | 69 / 100 |